Skip Ribbon Commands
Skip to main content

Cubberly JT Use Field

:

Cubberley ES WSM GMP#1 CC24-0764-08-A1-G1

The scope of work is…whole site modernization of administration/multi-purpose/food service and classroom buildings, including structural rehabilitation including wood beam replacement. Modification to mechanical, plumbing, electrical, data, communication systems to accommodate proposed work. Site work includes paving, earthwork, drainage, utilities, landscape, and irrigation.
   ​Cubberley ES -WSM (GMP1)                                      PSA Specialist:
   3201 Marathon Dr., San Diego, CA 92123                 Maria Cruz   mcruz5@sandi.net   (619) 879-7870

    Pre-Job Meeting Dates:                                                           Bid ad:        01/02/25
        05/29/2025                                                                       Bid award:   04/15/25 
  
​       
  
  
  
  
collapse Document Types : Bid Documents ‎(3)
2025-01-02_Bid Ad_Cubberley ES WSM GMP-1 (Construction).pdf
  
5/13/2025 9:06 AMCruz Maria
2025-04-22_Sub List_Cubberley ES WSM GMP-1 (Construction).pdf
  
5/13/2025 9:06 AMCruz Maria
Final Results_Cubberley ES WSM LLB CC24-0764-08-00-P1.pdf
  
5/13/2025 9:09 AMCruz Maria
collapse Document Types : Letters of Assent (LOA) & Pre-Job Forms (PJCF) ‎(42)
_GC Balfour Beatty LOA.pdf
  
5/13/2025 9:09 AMCruz Maria
_GC Balfour Beatty PJF (NSP).pdf
  
5/29/2025 9:06 AMCruz Maria
Advance Plumbing LOA.pdf
  
5/28/2025 6:32 PMCruz Maria
Advance Plumbing PJF (12, 230).pdf
  
5/28/2025 6:32 PMCruz Maria
Advance Plumbing tier Farwest Insulation LOA.pdf
  
5/28/2025 6:32 PMCruz Maria
CG Acoustics LOA.pdf
  
5/28/2025 6:42 PMCruz Maria
CG Acoustics PJF (619).pdf
  
5/28/2025 6:42 PMCruz Maria
F.J. Willert Contracting LOA.pdf
  
5/23/2025 11:13 AMCruz Maria
F.J. Willert Contracting PJF (12, 89).pdf
  
5/23/2025 11:13 AMCruz Maria
F.J. Willert tier Bancroft Construction LOA.pdf
  
5/29/2025 9:02 AMCruz Maria
F.J. Willert tier Bancroft Construction PJF (89).pdf
  
5/28/2025 6:54 PMCruz Maria
F.J. Willert tier Cable, Pipe, and Leak Detection LOA.pdf
  
5/28/2025 6:55 PMCruz Maria
F.J. Willert tier Cable, Pipe, and Leak Detection PJF (89).pdf
  
5/29/2025 11:57 AMCruz Maria
F.J. Willert tier Cement Cutting LOA.pdf
  
5/28/2025 6:57 PMCruz Maria
F.J. Willert tier D3 Construction LOA.pdf
  
5/28/2025 6:59 PMCruz Maria
Flexground LOA.pdf
  
5/28/2025 7:08 PMCruz Maria
Flexground PJF (89).pdf
  
5/28/2025 7:08 PMCruz Maria
Hamel Concrete LOA.pdf
  
5/29/2025 11:59 AMCruz Maria
Hamel Concrete PJF (12, 89, 500, 619).pdf
  
5/28/2025 7:08 PMCruz Maria
Inland Pacific Tile LOA.pdf
  
5/28/2025 7:16 PMCruz Maria
Johnson Controls Fire Protection LOA.pdf
  
5/28/2025 7:16 PMCruz Maria
Johnson Finch and McClure LOA.pdf
  
5/28/2025 7:17 PMCruz Maria
Johnson Finch and McClure PJF (619).pdf
  
5/28/2025 7:42 PMCruz Maria
OT Electrical LOA.pdf
  
5/28/2025 7:23 PMCruz Maria
OT Electrical PJF (569).pdf
  
5/28/2025 7:24 PMCruz Maria
OT Electrical tier Pathway Communications PJF (569).pdf
  
5/28/2025 7:24 PMCruz Maria
OT Electrical tier World Bridge LOA.pdf
  
5/28/2025 7:24 PMCruz Maria
OT Electrical tier World Bridge PJF (569).pdf
  
5/28/2025 7:25 PMCruz Maria
Pacific Play Systems LOA.pdf
  
5/28/2025 7:33 PMCruz Maria
Pierre Landscape LOA.pdf
  
5/28/2025 7:34 PMCruz Maria
Pierre Landscape PJF (12, 89, 345).pdf
  
5/28/2025 7:34 PMCruz Maria
RAP Engineering LOA.pdf
  
5/28/2025 7:34 PMCruz Maria
RAP Engineering PJF (12, 89).pdf
  
5/28/2025 7:35 PMCruz Maria
San Diego Sheet Metal LOA.pdf
  
5/28/2025 7:43 PMCruz Maria
San Diego Sheet Metal PJF (206).pdf
  
5/28/2025 7:44 PMCruz Maria
San Diego Steel Solutions LOA.pdf
  
5/28/2025 7:50 PMCruz Maria
San Diego Steel Solutions tier San Diego Steel Errector LOA.pdf
  
5/28/2025 7:51 PMCruz Maria
San Diego Steel Solutions tier San Diego Steel Errector PJF (229).pdf
  
5/28/2025 7:51 PMCruz Maria
Standard Drywall  LOA.pdf
  
5/28/2025 7:51 PMCruz Maria
Sun Pacific Glazing LOA.pdf
  
5/28/2025 7:59 PMCruz Maria
Watkins Environmental LOA.pdf
  
5/28/2025 7:59 PMCruz Maria
Watkins Environmental PJF(12, 89. 300).pdf
  
5/28/2025 7:59 PMCruz Maria
collapse Document Types : Notice to Proceed (NTPs) ‎(1)
2025-04-16_NTP_Cubberley ES WSM GMP-1 (Construction).pdf
  
5/13/2025 9:09 AMCruz Maria